A 12 inch hole is at the wide end of what a 4×4 post needs, and it uses noticeably more concrete than a 10 inch one.
Based on a 12 in hole, 30 in deep, on a 4 in gravel base.
The post itself displaces less than you would think. A 4×4 is actually 3.5 in square, so it occupies about 12.25 square inches of a 113 square inch bore — around 11%. The gravel base takes out more than the post does. Using the nominal 4 in figure instead of the real 3.5 in overstates the displacement by nearly a third.
Every assumption above is editable. Change the length, the spacing, the hole size — the numbers and the working update as you go.
These are typical values, not requirements. Post depth in particular is governed by your local frost line and building code — check before you dig.
National planning ranges compiled from published US construction cost guides, last checked September 2026 (confidence: medium-low). Prices vary sharply by region, season and contractor. These are estimates for planning, not quotes.
Sources: homeguide.com, calcsummit.com, ergeon.com, homewyse.com
| Material | Size | Quantity |
|---|---|---|
| Posts | 4x4 | 14 |
| Rails incl. waste | 2x4 | 43 |
| Pickets incl. waste | 1x6 | 230 |
| Concrete mix | 36bags | |
| Gravel | 8bags | |
| Exterior screws | ≈1,500 |